Home arrow Projects
Projects
Mare Turkey  E‑mail
Wind energy
 

The project
This project, which involved building an onshore wind farm in Izmir Province, was developed as a Gold Standard Voluntary Emission Reduction (GS-VER) Project. Having started in June 2007 and receiving registration as a Gold Standard project in November 2007, this was the first renewable energy initiative in the world to meet the VER standards as a voluntary project.

 

Project data

Timeframe:

the project is operational since June 2007

Installed capacity:

40 MW

Production:

120,8 GWh per year


Read more...
 
Burgaz Turkey  E‑mail
Wind energy
 

Project data

Timeframe:

the project is operational since September 2007

Installed capacity:

15,2 MW

Production:

51 GWh per year


The project
The Burgaz project, which involved building an onshore wind farm, starting in September 2007, was developed as a Gold Standard Voluntary Emission Reduction (GS-VER) Project.

Read more...
 
Sayalar Turkey  E‑mail
Wind energy
 

The project
This project, which involved building an onshore wind farm in Manisa Province, Turkey, is being carried out as a Gold Standard Voluntary Emission Reduction (GS-VER) Project. The wind farm became operational in January 2008.

 

Project data

Timeframe:

the project is operational since January 2007

Installed capacity:

30,4 MW

Production:

116 GWh per year


Read more...
 
Ganganagar India  E‑mail
Bio energy

The project
This project involved building a biomass–based power generation plant, which uses direct combustion boiler technology to generate electricity from mustard crop residues in the district of Ganganagar (State of Rajasthan) in India.

 

Project data

Timeframe:

Operational 2008

Installed capacity:

7.8 MW

Production:

51,2 GWh per year


Read more...
 
OUR MISSION: A SUSTAINABLE ENERGY SUPPLY FOR EVERYONE