Wind energy
|
The project
This project, which involved building an onshore wind farm in Izmir Province, was developed as a Gold Standard Voluntary Emission Reduction (GS-VER) Project. Having started in June 2007 and receiving registration as a Gold Standard project in November 2007, this was the first renewable energy initiative in the world to meet the VER standards as a voluntary project.
|
|
Project data
Timeframe:
the project is operational since June 2007
Installed capacity:
40 MW
Production:
120,8 GWh per year
|
|
|
|
Read more...
|
|
|
Wind energy
|
 |
|
Project data
Timeframe:
the project is operational since September 2007
Installed capacity:
15,2 MW
Production:
51 GWh per year
|
|
|
The project
The Burgaz project, which involved building an onshore wind farm, starting in September 2007, was developed as a Gold Standard Voluntary Emission Reduction (GS-VER) Project.
|
|
|
Read more...
|
|
|
Wind energy
|
The project
This project, which involved building an onshore wind farm in Manisa Province, Turkey, is being carried out as a Gold Standard Voluntary Emission Reduction (GS-VER) Project. The wind farm became operational in January 2008.
|
|
Project data
Timeframe:
the project is operational since January 2007
Installed capacity:
30,4 MW
Production:
116 GWh per year
|
|
|
|
Read more...
|
|
|
Bio energy
|
The project
This project involved building a biomass–based power generation plant, which uses direct combustion boiler technology to generate electricity from mustard crop residues in the district of Ganganagar (State of Rajasthan) in India.
|
|
Project data
Timeframe:
Operational 2008
Installed capacity:
7.8 MW
Production:
51,2 GWh per year
|
|
|
|
Read more...
|
|
|
|